CLOSE

This website uses cookies. By closing this banner or browsing the website, you agree to our use of cookies. CLOSE

1st Lot of 4th Highway Ring Road from Khemis Miliana to Berrouaghia

KEY FACTS

Services:
• Design review
• PMC
• Construction Supervision

Location:
Medea, Ain Defla, Berrouaghia

Country:
Algeria

Client:
A.N.A. (National Highways Authority)

Completion date:
Ongoing

Characteristics:
• 67 km of highway
• 4 interchanges
• 10 viaducts, 4 km in length
• 35 underpasses
• 150 minor hydraulic structures

GALLERY

The project is related to the construction of the road link between the cities of Khemis Miliana and Berrouaghia (East-West Highway) from CH 0+000 to CH 67+212.

 

The road alignment length is about 67 km (3 lanes + emergency lane) with design speed of 130 km/h. The road includes 4 interchanges, 4 km of viaducts (no.10) and 35 underpasses, 150 minor hydraulic structures.

We are providing project control, design review, detailed design and shop drawings prepared by the Contractor before the construction of concerned works; technical assistance to ANA (National Highway Agency), quality control and monitoring of construction works, quality management,  inspection of works,  control and approval of materials, training courses in Italy in tunnel construction and management, and in Algeria in Information Technologies (software Primavera) and checking of payment certificates, assistance for claims, up to taking over certificate.